GuidesMay 22, 20265 min read

How Long Does a Thermos Replacement Take? The Step-by-Step Process

Discover every step of a thermos replacement, from the initial diagnosis to the final installation. Timelines, process and what to expect.

Erik Deschênes, owner

Reviewed by Erik Deschênes, owner · Updated on

How Long Does a Thermos Replacement Take? The Step-by-Step Process

The complete thermos replacement process

Many homeowners hesitate to have their sealed units replaced because they don't know what to expect. How long does it take? Will my home be open to the elements during the work? Will I need to repaint? Here's a complete guide to the process, from the first contact to the final installation.

Step 1: Diagnosis and measurements (15 to 30 minutes)

The initial assessment

A technician comes to your home to assess the condition of your windows. He checks:

  • The number and location of the thermos units to be replaced.
  • The condition of the frames, hardware, weatherstripping and caulking.
  • The type of glass required (tempered, Low-E, tinted, etc.).
  • The presence of special spacers or non-standard shapes.

Taking the measurements

Each thermos (sealed glass unit) is measured precisely:

  • Width and height of the visible glazing, measured at three different points.
  • Total thickness of the sealed unit (important for compatibility with the frame).
  • Type and width of the existing spacer.

Measurements are recorded to the millimetre. That precision is what guarantees a perfect fit for the new thermos.

Step 2: The quote and the order (1 to 3 days)

After the visit, you receive a detailed quote that includes:

  • The unit price of each thermos (based on dimensions and options).
  • The available options: glass type, Low-E coating, argon gas, tint.
  • Recommended related work (caulking, weatherstripping, hardware).
  • The total cost including labour and taxes.

Check our prices page for an overview of rates even before the visit. Once the quote is accepted, the order is placed with the manufacturer.

Step 3: Manufacturing (2 to 3 weeks)

Your sealed units are custom-made in Quebec. The manufacturing time varies depending on:

  • The time of year: fall is the busiest season (everyone wants to replace before winter). In spring and summer, lead times are generally shorter.
  • The type of glass: special options (triple glazing, tempered glass, non-standard shapes) can lengthen the lead time.
  • The volume: an order of 1 to 3 thermos units generally moves faster than an order of 15+.

In general, count on 2 to 3 weeks; special orders may take a little longer.

Step 4: Installation (less than an hour per thermos)

Preparation

On installation day, the technician:

  • Protects the floors and furniture around each window with drop cloths.
  • Prepares his tools and checks the new sealed units one last time.

Removing the old thermos

  • The glazing beads (mouldings that hold the glass in the frame) are carefully removed with a special tool to avoid damaging them.
  • The old thermos is pulled out of the frame. If it's broken or fogged, it's handled with care to avoid shards.
  • The frame is cleaned: old sealants removed, the rabbet base cleaned, drainage holes checked.

Installing the new thermos

  • The setting blocks are positioned correctly at the bottom of the frame (at one quarter of the width from each corner).
  • The new thermos is inserted carefully into the frame.
  • A bead of sealant is applied between the glass and the frame.
  • The glazing beads are put back and fastened.
  • The exterior caulking is redone if needed.

The final check

  • The technician checks the seal, the proper operation of the window and the final appearance.
  • He cleans the glass and the work area.
  • An installation report is given to you with the warranty details.

Total length of the process

Here's a summary of typical timelines:

  • Diagnostic visit: 15 to 30 minutes (day 1).
  • Quote: 1 to 3 business days.
  • Manufacturing: 2 to 3 weeks in general.
  • Installation: less than an hour per thermos (installation day).

For a typical project of 3 to 5 thermos units, the total installation time is about 2 to 3 hours. Your home is never "open" — each window is exposed for only a few minutes while the glass is swapped.

Frequently asked questions about the process

Does it make a big mess?

No. Thermos replacement is clean work. There's no construction dust or significant debris. The technician cleans up as he goes.

Do I need to be there?

Yes, ideally. The technician needs access to the windows from the inside and may have questions or recommendations during the work.

Is winter a good time to replace?

It's possible, but not ideal. Sealants perform better in mild weather (above 5°C). If it's urgent, the replacement can be done in winter, but the exterior caulking will have to be completed in the spring. The best times are spring and fall.

How much does it cost?

The cost depends on the dimensions, the type of glass and the number of units. Visit our prices page for a detailed estimate or check our shop to see the available products. Replacing a thermos costs $149 to $400 per installed unit, a fraction of the price of a new window.

Ready to get your project started? Contact Vosthermos to schedule your free diagnostic visit. We serve Montreal, Laval, the South Shore and surrounding areas.

Share:

Need help with your doors or windows?

Our technicians can advise you and handle all your repairs. Free quote!